Little Rock Elementary School Modernization, Tumwater, WA |
Completion Date: 2017 | Size: 35,000 SF | Cost: $15M Services Provided: Electrical and lighting
Case Engineering designed a new electrical service that required a coordinated power cutover between the two existing buildings and the new addition and structure connecting them, all while staff and students continued classes throughout the 14-month project. |