Holy Names Academy Pavilion, Seattle, WA

Picture
Completion Date: 2017 |  Size: 9,000 SF  
​Services Provided: Electrical and lighting, and telecommunications


This project expanded the commons and fitness area between the historical school building and the newer gymnasium. Case Engineering supported integration of the 100-year old electrical system with the new addition. Conduit routing options were limited due to the existing historic structure. Case’s lighting design included fixtures that blend in with the existing historical elements.